II. HistoryThe history of proposals for transparent warhead dismantlement dates backat least a decade, to the days of Perestroika and Glasnost in the SovietUnion (see Appendix 1). In 1989 the Russian government allowed a U.S.group of non-governmental scientists to conduct measurements of neutronand gamma radiation of a nuclear warhead aboard the Russian ship "Slava."The U.S. Congress then raised the issue of warhead dismantlementperiodically in the early 1990s in relation to the ratification debate ofSTART I. The U.S. Executive Branch, however, did not become interested inthe subject until the coming to power of the Clinton administration. Key developments toward the creation of a warhead transparency regimeduring this period occurred during 1994-95 and 1996-98. In the firstperiod the official government-to-government dialogue dominated thesubject. In the latter period, and up to today, thelaboratory-to-laboratory process has been the primary vehicle forprogress.
The Safeguards, Transparency and Irreversibility Initiative
The first U.S.-Russian nuclear warhead and materials transparency effortwas launched at the January 1994 Summit when the two presidents agreed ona goal of "ensuring the transparency and irreversibility of the process ofreduction of nuclear weapons." The initiative, dubbed the "Safeguards,Transparency, and Irreversibility (STI)" initiative, was largely designedto ensure that fissile materials from eliminated warheads would not berecycled into new weapons. In May 1994, an STI Joint Working Group wasestablished to work on the following five issues: Agreement forCooperation, stockpile data exchange agreement, spot checks to increaseconfidence in fissile material declarations, Mutual Reciprocal Inspections(MRI), and Limited Chain of Custody (LCC). (2)
The objective of the stockpile data exchange procedures was to create anexchange of information regarding stockpiles of fissile materials andnuclear warheads that could to some extent be confirmed through spotchecks. Such exchanges, it was thought, would replace stockpile estimateswith facts and serve as the basis for a future transparency regime.However, despite the creation of a detailed list of stockpile informationto be exchanged, the discussions on this issue were quickly stalled.
In the area of MRI, the proposed activity was to have U.S. and Russiantechnical experts develop non-intrusive techniques of confirming that, atthe end of the dismantlement process, a declared fissile materialcontainer contains a weapon-grade plutonium or highly-enriched uranium(HEU) object the shape and mass of which (in the case of a warhead pit)are consistent with those of a warhead component. (3)During 1994 and 1995, Russian and U.S. experts developed and demonstratedsome promising MRI techniques but no consensus was reached on the scope offissile material measurements or specific MRI procedures.
The limited Chain of Custody measures envisioned following specific excesswarheads or fissile materials recovered from dismantled warheads byplacing tags and seals on containers, and, possibly, by using additionalremote monitoring techniques such as TV surveillance. (4)The LCC discussions during the STI initiative did not advance tospecifics.
The Agreement for Cooperation was to be the legal instrument that wouldallow the United States and Russia to exchange sensitive and classifiedinformation. The agreement was required in the United States by the AtomicEnergy Act. It was believed that such an agreement was critical for dataexchange or plutonium MRI. The two countries generally agreed on the levelof protection of sensitive and classified information that might beexchanged under an Agreement for Cooperation. (5) Howeverthe difficult negotiation of this centerpiece document soon became anobstacle to progress of the STI initiative.
As a result, the entire STI initiative collapsed in the fall of 1995 when,following an internal interagency policy review, the Russian governmentstopped all STI discussions. Participants in the negotiations and outsideobservers attribute this failure to a combination of the followingfactors: distractions and uncertainties created by Russia's presidentialelections; inadequacy of the Russian interagency process; lack of intereston the part of the Russian Ministry of Atomic Energy (Minatom); resistancefrom the Russian Federal Security Service (FSB); and a lack of aconsistent high-level political attention in the United States.
Still, official, high-level support for verified warhead dismantlement didnot entirely collapse after 1995. The issue was resurrected at the March1997 Presidential Summit in Helsinki when Presidents Yeltsin and Clintonagreed that the proposed START III agreement would include "measuresrelating to the transparency of strategic nuclear warhead inventories andthe destruction of strategic nuclear warheads and any other jointly agreedtechnical and organizational measures, to promote the irreversibility ofdeep reductions including prevention of a rapid increase in the number ofwarheads." However, this statement was met with some confusion as to itsactual meaning in the U.S. bureaucracy and resistance to warheadtransparency in some portions of Russia's bureaucracy remained despite thestatement.
In the meantime, the U.S. and Russian governments have been quietlynegotiating and implementing some elements of a fissile materialtransparency regime under the HEU purchase agreement, the agreement tostop the production of plutonium for weapons, and theU.S.-Russian-International Atomic Energy Agency (IAEA) trilateralinitiative to monitor fissile materials that have been declared an excessto national defense requirements (see Appendix 2). Bilateral work onverified and irreversible dismantlement of nuclear warheads, however, hasshifted away from the government-to-government channels and into moretechnical exchanges between the national nuclear laboratories.
The Laboratory-to-Laboratory Program
After the collapse of the official STI negotiations, the Department ofEnergy provided approval for a quiet process of U.S.-Russian nationallaboratory cooperation on the technical aspects of verified warheaddismantlement. This lab-to-lab work built on the relationships and mutualtrust that had been created in the U.S. Department of Energy fundedcooperative lab-to-lab fissile material protection, control and accounting(MPC&A) program. The Russian and U.S. national nuclear labs have therequisite technical expertise in this area and the U.S. labs had alreadyconducted internal studies of various aspects of the problem. For example,DOE's warhead dismantlement study group prepared a report, Transparencyand Verification Options: An Initial Analysis of Approaches for MonitoringWarhead Dismantlement, (May 1997). This report, which has never been madepublic officially but has been widely distributed to interested experts,has become a roadmap for both the U.S. domestic- and U.S.-Russianlab-to-lab analyses of warhead-transparency issues. While it is assumedthat Russian institutes have also conducted internal assessments of thisissue, there does not seem to be a comparable, comprehensive study similarto that done by the U.S. laboratory study group.
Once the decision to initiate lab-to-lab cooperation had been made, thefirst discussions on transparency were started in late 1995 at anarms-control workshop in Chelyabinsk-70. This workshop paved the way for a1996 contract between Chelyabinsk-70 and the Sandia National Laboratoriesto conduct a cooperative study on warhead dismantlement transparency. Thisinitial effort was funded at about $400,000 and was intended to sustain atechnical dialogue on warhead dismantlement with Russian specialists;create knowledgeable advocates for dismantlement transparency in Russia'snuclear weapons design community; and develop a bilateral understanding ofthe technical foundations for transparency.
The success of the first lab-to-lab warhead transparency project helped toovercome an initial skepticism that existed in Minatom's headquarters and,in 1996 - 1998, new contracts were negotiated, additional meetings tookplace, and participation in the program expanded. November 1997 meeting inChelyabinsk-70, for example, was attended on the Russian side byrepresentatives from Arzamas-16, Chelyabinsk-70, the Institute ofAutomatics, the Institute of Impulse Technologies, the four warheaddismantlement plants, and Minatom. On the U.S. side, the meeting wasattended by representatives from the Sandia National Laboratories,Lawrence Livermore National Laboratory, Los Alamos National Laboratory,Pacific Northwest National Laboratory, Oak Ridge Y-12 plant, Pantex plant,and U.S. Department of Energy.
Because of the continuing sensitivity of the subject, lab-to-lab workfocuses only on hypothetical dismantlement scenarios, technicaltransparency measures, and table-top (a scaled-down mock-up) and computermodels of the dismantlement process. The overall plan envisages fourphases of work: 1) preliminary studies, 2) advanced studies, 3)laboratory-scale technology demonstration, and 4) technology demonstrationat a dismantlement facility. Ideally, the process will yield a jointapproach to warhead dismantlement transparency that could be presented topolicy-makers in the two countries and incorporated into future armscontrol treaties.
As of 1998, the process has reached the third phase and DOE's annualbudget has increased to $10 million. At April and May 1998 workshops inChelyabinsk-70 and Arzamas-16, Russian experts demonstrated proposedtechnologies for fissile-component radiation measurements, detection anddisposition of high explosives, and elimination of warhead casings. Atable-top model of the dismantlement process also was completed. It washoped that deployment of a prototype transparency system would occur in1999.
The Clinton-Yeltsin agreement at the Helsinki summit has changed thedynamic of the laboratory-to laboratory effort, however, by bringing thisfairly obscure cooperative R&D effort to the attention of politicalleaders and security specialists. In November 1998, the Russian securityservices first interrupted and then slowed down the implementation of thelab-to-lab warhead transparency contracts pending an interagency review ofthe program. As of early 1999, the review has not been completed.
Problems Aside from the difficulties that the warhead dismantlement regime hasfaced to date, there are a number of detailed and interrelated technical,operational, and political problems that must be resolved in coming yearsif a regime is to move beyond conceptual studies into practicalimplementation. Specifically, the parties must confront questions oftechnology readiness, dangers of revealing sensitive warhead-designinformation, the operational impact of warhead-dismantlement inspectionson co-located stockpile maintenance activities, asymmetries of the warheadcomplexes and arsenals, interchangeablility of certain strategic andtactical warheads, Russia's potential inability to finance verifiedwarhead-dismantlement activities, the mixed record of past transparencyefforts, and political resistance that often stems from seeminglyunrelated U.S.-Russian difficulties.
Technology
As of the summer of 1998, many U.S. and Russian experts were reportedlyfavoring warhead transparency approaches based on the use ofchain-of-custody- and radiation-template technologies (see Appendix 3).The leaderships of the lab-to-lab transparency program believed at thattime that there were no major technical obstacles to this approach, andshould a policy decision be made, the technology could be ready fordeployment within 12 months.
A primary technology that would be used in the chain-of-custody proceduresis tamper-indicating devices (tags and seals). These have been employedextensively for domestic safeguards and international verificationpurposes for many years, and the U.S. and Russian national laboratorieshave a considerable expertise in developing and evaluating these devices.There is a wide range of tags and seals that have been developedspecifically for arms control applications or that are availablecommercially.
However, questions have been raised about the effectiveness of tags andseals in a warhead dismantlement transparency scenario. According to LosAlamos experts, "most tags and seals are highly vulnerable to tamperingwhen they are not being monitored. In one study, every seal tested wasdefeated within five minutes (if the seal was not under some form ofmonitoring). This study demonstrated that without careful considerationsas to selection of which tags and seals to use, the establishment ofprocedures for their application, removal, and autopsy, and monitoring ofseals between application and removal, tags and seals may be of limitedvalue in maintaining the chain-of-custody of an item." (7)
It is believed that no radiation template measurements are used at theRussian dismantlement plants on a routine basis. According to a U.S. armscontrol expert, "Russians will resist any unproven [verification]technology, and will stress low-cost and low-tech approaches." (8)
This assessment has been borne out as some Russianexperts have already expressed reservations regarding the templateapproach and raised questions about its ability to protect sensitiveinformation.
In the proposed transparency regime, radiation-template technologies wouldbe used to satisfy inspectors concerning the identities of warheads andtheir fissile components without allowing them to derive sensitivewarhead-design information. (9) However, according toU.S. national laboratory experts, "Analyses of the efficacy of these[template] measurements both in protecting design information andauthenticating warheads are still preliminary." (10)Further development and validation of information barrier technologies isneeded before radiation template methods could be used to verify warheadelimination.
Additional joint laboratory experiments will likely be required to satisfycautious security officials and production managers. A final judgement onwhether the technology is ready for deployment and whether the parties arecomfortable with a particular technical solution will likely requiredemonstration and extensive testing (initially with unclassified,well-characterized objects) at the actual dismantlement facilities wherethe transparency measures are to be implemented.
Intrusiveness
The requirement of the U.S. and Russian governments that warheaddismantlement transparency technologies not allow very sensitive warheaddesign information to be revealed poses a significant challenge to thedevelopment of this new regime. The use of radiation measurements andtheir comparison with templates and threshold values for quantities offissile material and other variables, using computers which give only a"yes" or "no" answer, will make it possible to conduct inspections atmostly unclassified level. (11) Restrictions on directaccess to the dismantlement process while classified components areexposed and masking of any specialized dismantlement equipment whichreflects design information could allow the parties to avoid disclosure ofany weapon design information that is considered classified by theirnational laws.
However, classified-level inspections would greatly enhance confidence inthe transparency measures and would possibly be simpler and cheaper toorganize. Because of the high level of weapon design expertise in bothcountries, there should be little concern about exchanging currentlyclassified information related to general nuclear physics and warheaddesign principles. Still, exchanges of even trivial classified informationwould require an Agreement for Cooperation, which the U.S. and Russia havethus far failed to negotiate.
And certain information could not be shared even on a classified levelbecause of fears of revealing advanced warhead design features orvulnerabilities. (12) Even small snippets of informationcould be of concern when collated with intelligence data received fromother sources and analyzed using computer models for reverse-engineering.There are reports, for example, that the Russian security apparatus wasunhappy about the 1989 Black Sea experiment in which U.S. NGOorganizations were able to measure the complete gamma-ray spectrum from aRussian cruise missile warhead. (13)
An additional complication arises when the proposed bilateral transparencyregime is extended to international monitoring, as is contemplated underthe trilateral initiative, because it is absolutely essential thatinternational inspectors do not derive any classified weapons-designinformation.
Operational impact
The presence of foreign inspectors at national dismantlement plants wouldhave a significant impact on facility operations such as warheadevaluation, modernization and re-furbishing, which support the remainingnuclear stockpile. It is currently a requirement at the Pantex plant, forexample, that all operations stop during a visit by foreigners. Thisproblem might be particularly serious for the Russian weapons productioncomplex, which is believed to maintain a relatively higher warheadre-manufacturing rate because of much shorter life-times of Russianwarheads. (14)
Proper timing of stewardship activities, and masking and segregatingtransparent warhead dismantlement activities within isolated areas wouldmoderate this impact. Segregation could even be carried to the point wherethe dismantlement of treaty-limited warheads was isolated in dedicatedfacilities. The Russian government, for example, has decided to shut downthe warhead assembly plants in Penza-19 and Arzamas-16. One or both couldbe dedicated to verified warhead dismantlement. In the United States,treaty-limited dismantlement operations could be carried out at the DeviceAssembly Facility (DAF) on Nevada Test Site, which is no longer needed forits original purpose of assembling nuclear warheads for testing. Thisoption is already being evaluated by the U.S. DOE, but preliminaryanalysis has indicated that the DAF would require significant additionalinvestment to be made ready for this activity.
Asymmetry of the warhead complexes
One of the most difficult problems for negotiating and implementing awarhead transparency regime is likely to be the significant asymmetrybetween the warhead production complexes and dismantlement operations inthe United States and Russia (see Figures 1 and 2). In the United States,the dismantlement of intact warheads and storage of plutonium pits takeplace at only one plant, the Pantex facility outside of Amarillo, TX.Another facility, the Y-12 plant in Oak Ridge, TN manages and disassemblesHEU secondaries, which were removed from the warheads at Pantex, as wellas HEU-only gun-type warheads.
Russia has four "serial production" (assembly-disassembly) facilitieslocated at Arzamas-16, Sverdlovsk-45, Zlatoust-36, and Penza-19. (However,according to the Nuclear Complex Reconfiguration Program, adopted by theRussian Government in 1998, warhead dismantlement work will cease atArzamas-16 and Penza-19 by 2003. (15)) In addition,management and storage of HEU and plutonium components takes place inChelyabinsk-65 and Tomsk-7. The difficulties arising from the differencein the number of Russian and American facilities involved in warheaddismantlement are further complicated by the fact that each of the Russianserial production plants may have its own area of specialization. It hasbeen reported, for example, that the Sverdlovsk-45 plant makes physicspackages for most strategic missile systems (in addition to producingtactical weapons of certain types) that are subsequently sent toZlatoust-36 which builds them into ICBM/SLBM reentry vehicles. (16)